"Vertical" link to symbol on same task bar

Question:     

Do you know how you can link to task within the same task bar? I would like to create a vertical link between two symbols on the same row.

 

Answer:

 

Connector types 43-46 (right) were designed to assist with this.

By adjusting the level of the symbol (upper, middle, lower), it's possible to show links such as these:

Note that these are really horizontal bars.  True vertical links work only between tasks.

               

 

 

 

 

 

 

 

 


 

Related topics

Three ways to add vertical links

Number of Vertical Links

Vertical connectors in the legend

Vertical connectors on a multi-page schedule

Vertical link not working

Vertical links (Milestones Help)

 

 

 

 

 

 

 

 

Applies to Milestones Professional:      2017        2019         2021         2023

 

   

   

   

   

 

 

 

The fast easy way to schedule your projects:  Milestones Software by KIDASA Software, Inc. www.kidasa.com

Copyright © 2021 KIDASA Software, Inc. All rights reserved.