Vertical links are used to establish dependencies (predecessor and successor relationships) between dates on different task rows.
Tutorial Lesson 4 - Customize the toolbox and Tutorial Lesson 5 - Work with dependencies
Contents
|
|
|
|
|
Each symbol (predecessors)can have up to 5 vertical links originating from it. They can connect to any other symbol (successor) on another task row. Then, when symbol dependency mode is turned on, and a symbol is moved, any dependent symbols will move by the same amount of time. Set up a dependency
|
![]() |
|
Set up many dependencies at once:This method should only be used when only one start symbol and/or one end symbol are on each task row.
|
![]() |
|
|
Delete vertical links:Delete links from a single symbol
Delete all vertical links from selected task rows:
Delete selected vertical links:Up to five vertical links can extend from a single symbol. Selected vertical links can be deleted in the Symbol Properties dialog box.
Hide or show vertical linksHide vertical links:
Show vertical links:
|