Answer:
You should be able to do this. When in Continuous View, there should not be more than one page. If the end of the vertical connection is a milestone off of the screen (in the future), use Shift+PageDown to get to it, instead of clicking the forward-scrolling arrow. Remember the steps to place a vertical connector: (all of these clicks are single clicks)
The vertical connector should then appear.
|
|
Add vertical links between different pages Vertical links (Milestones Help) |
Applies to Milestones Professional: 2017 2019 2021 2023
The fast easy way to schedule your projects: Milestones Software by KIDASA Software, Inc. www.kidasa.com
Copyright © 2021 KIDASA Software, Inc. All rights reserved.