Answer:On the above example, the current date line is the red dashed vertical line shown in September. The issue with this chart is that the option to fill bars to the status date is chosen. This option affects solid line bars by causing them to be dashed after the status date. Turn off Fill to Status for Connectors
|
|
|
Create and add custom symbols to the toolbox Copy a toolbox to another schedule Can I set up a default format and toolbox? Above the bar symbol in the toolbox |
Applies to Milestones Professional:
2017
2019
2021
2023
2025