Is there a way to have the date be part of the Note?
I notice that the Milestones schedules all have different toolboxes. Can I customize my toolbox so that when I create new schedules, I always start with the same toolbox?
Lock symbols to a date when moving to another row
Is there any way to lock the symbol date when moving from one task row to another task row?
Three ways to add vertical links
I need to add a vertical links on my schedule. Sometimes symbols to be linked are on separate pages, sometimes on the same page. What are my options?
Is there a way to have the date be part of the Note?
Design symbols for use with Milestones
Is there a way to have the date be part of the Note?
Filter by symbols and date range
We are trying to filter items with more than one symbol for a specific date range. Is there another way to do this?
Applies to Milestones Professional:
2017
2019
2021
2023
2025
The fast easy way to schedule your projects: Milestones Software by KIDASA Software, Inc. www.kidasa.com
Copyright © 2025 KIDASA Software, Inc. All rights reserved.