Question:     

I have my symbols vertically linked and they are not moving as expected.

 

Answer:

First, make sure dependency mode is turned on. Dates | Date Related Settings and (check) Dependency Mode.

If it still doesn't work as expected, the next thing to check is that symbols being used are designated in the toolbox as "normal" and not baseline or comment.

Note that baseline symbols will move when vertically connected however if connected to a normal symbol the software will ask if you want a baseline symbol to move or be locked.

 

 

 

 

 

 

 

 

 


 

 

Related topics

Three ways to add vertical links

Number of Vertical Links

Vertical connectors in the legend

Vertical connectors on a multi-page schedule

Vertical link not working  

Vertical link properties (Milestones Help)

 

 

 

 

 

 

 

 

 

Applies to Milestones Professional:      2017        2019         2021         2023

 

   

   

   

   

 

 

 

The fast easy way to schedule your projects:  Milestones Software by KIDASA Software, Inc. www.kidasa.com

Copyright © 2021 KIDASA Software, Inc. All rights reserved.