Answer:The baseline dates would need to be in the same excel row as the actual dates and they will import into the same line when mapped to a Task field. Tutorial Lesson 9 includes instructions for importing from Excel. Here's an example of an imported schedule:
|
|
|
Remove all baseline or status symbols Show baseline dates without showing baseline symbols Calculate BCWS using baseline duration |