(Click the question title for the answer)
No change or unexpected changes after schedule refresh
Nothing is happening when I refresh my master schedule. I previously refreshed from multiple MS Project files but now I want to pick just one MS Project file. How can I resolve this?
Set up a default format and toolbox
I want all new schedules to be in a certain format, with only the symbols and connectors I use displayed in the toolbox. Is this possible?
How do I shade holidays?
Share import filter with others
We are using Excel to enter information that we import into Milestones Professional. We have several Excel users who are entering the information. I have a filter that works for me when importing with our Excel spreadsheet. How can I share my filter with other Excel users who also use Milestones?
Share schedules with those who do not have Milestones
I have Milestones but many of my co-workers don't have the software. I want to be able to share my schedules with them. What are my options?

Is there an easy way to reschedule a task (start symbol, bar, end symbol) to another date without individually moving the symbols?
I want to have the same text appear for a certain symbol (without having to add text to the symbol after each time I add the symbol to the schedule). How can I do this?
I would like to display row numbers on my schedule. Is there any way to do this?
Why are summary bars not showing
I have an outlined schedule. Why aren't my summary bars showing up?
How can I "zoom in" to see more detail on a schedule?

Can I show the duration of a horizontal task bar as the text for that bar? Can I add text to it? For Example [duration] working days.

I want to show my schedule dates in French. Is this possible?