(Click the question title for the answer)
|
Move a symbol and keep the same date When I move symbols to another task row, the dates changes. I want the dates to stay the same when the symbols are rearranged on the schedule. Is there a way to make them stick to their original date? I want to move tasks on one page over to another page. What's the procedure? Force a bar to be on top of another one I have two bars which partially overlap. How can I force the green bar to be hidden behind the red bar?
Code your Microsoft Project file for fast one page schedules My Microsoft Project schedule is just unwieldy, about 10,000 tasks. I would like to be able to pick certain tasks that are in Microsoft Project and show ONLY those tasks and group them together in about 5 groups. Part of the problem is that the tasks aren't together in Microsoft Project. Is there any way to get these related tasks to appear in a group on my presentation chart?
I would like to make a legend I can just drag around, but the standard legend options aren't flexible enough for my needs.
Set vertical symbol position via automation I can't seem to find a way to set the position of a symbol (upper/middle/lower) via automation. Is there a way to do this?
Work with a schedule with no columns I am converting my schedule to a "no columns" schedule so that it is more presentable. I have "issues" doing some of the task line tasks I'm used to doing by selecting a task row in the column. For example, I'm having trouble changing the shading of a task row. How do I select a task and then do what I need to do? I am sharing my schedule with others. However, when I share the schedule, all of my custom bitmap symbols are missing and show up as blank symbols in the toolbox. |
|
|