Tips & Tricks for February 2022
(Click the question title for the answer)
Move symbols ahead by 2 months
How can I move a group of symbols about 2 months to the right all at the same time?
Horizontal bar has white stripe
I am using Milestones Professional to build a chart for our management. The task bars I am inserting (which should be solid) have a white stripe through the middle of them. Here's a picture.
I need to display custom header and footer information on all pages of my schedule. Is this possible?
What can affect Fill to Status Date?
I have the Symbols: Fill to Status Date and Bars: Fill to Status Date options toggled on. However, it is not working. What could be disabling this feature?
I want my symbol to look like this. Is it possible?
Remove all baseline or status symbols
I want to remove all of the baseline symbols and status symbols on my schedule. Is there an easy way to do this?
Show curves and bars in DataGraph
I need to create a data graph with both bars and lines on the same DataGraph area. It appears that DataGraphs can either be bar graphs or line graphs, but not a mix. Suggestions?
Am I able show two date lines using Milestones Professional? For example, I want to show a status line ( i.e. Sept 8, 2017) and a date line that's in the future (i.e. Oct 1, 2018).
Is there a way to delete or remove a vertical connection once it has been created?
Nothing in Start and End Date SmartColumns
I don't see anything in the Start and End Date SmartColumns. Any idea why?
Display the date line in back of symbols and bars
Is there a way to display the date line so it shows in back of symbols and bars instead of in front of them?
How can I create a bar with no symbols on the ends?
Filter to remove tasks which are 100% complete from view
I would like to turn on a filter that would remove tasks that are 100% complete from the view. Is this possible?
I have a problem with the currency symbol display in a column. We use the Euro, ˆ (symbol). I have correctly set the Control Panel > Regional Options for currency in EURO with the symbol. Milestone does not seems to acknowledge the change and therefore I remain with the $ (US dollar Symbol) on each schedule. Is there a way to overcome the problem?
Turn off collapse/expand indicators
I would like to turn off the red triangles which appear in my first column to the left of the schedule area. How can I do this?Creating vertical connectors in Continuous View
Now that my schedule is outlined, I would like to display summary bars. How do I turn these on?
I want to have the same text appear for a certain symbol (without having to add text to the symbol after each time I add the symbol to the schedule). How can I do this?
Symbol tags across multiple files
Is it possible to create a report that compares tags across multiple files? For multiple tasks that have the same name, would it be possible to consolidate those and compare the tags?Question:
Center vertical connection on a bar
I need to connect a symbol from one row to the center of a bar on another row. It looks like vertical connectors only go from symbol to symbol. Is there any way to show the connector hitting the middle of a bar?
HTML Publishing - need a master schedule with sub schedules
I'm generating HTML tiered hierarchy from a Master Schedule for 4 sub-schedules. Each sub-schedule has a summary bar, level 1, and some level 2 tasks. The main HTML output of Master shows only the Summary bars. Clicking a summary bar takes me to the sub-schedule. (Expected behavior) What I want is to control how many task levels are displayed on the HTML Master in the tiered output. For example, I would like HTML Master to show Summary and all Level 1 tasks, rather than just the Summary bar for each sub schedule. Is this setup possible?
Change the number of task rows per page
I need more rows on my schedule. How can I add more rows?
Clear all symbols within a date range
I have a horizontal year-by-year listing of events for the next five years. I want to get rid of events (symbols) I scheduled in one year without clearing the other years' symbols. How can I do this?
Show date and text on one line with two colors
I want to show the date on a symbol along with some text in a different color. It should show the date along with the stage of the project. For example: 3/20/2017 - (Stage 4). I'm trying to do this as a symbol note. It seems I can only change the color for each line of text though. Any ideas?
Can not select symbols on some rows
Some of the rows on my schedule have symbols which I can not select. I would like to change or delete the symbols but can not select them for deletion.
Applies to Milestones Professional: 2019
2021
2023
2025
The fast easy way to schedule your projects: Milestones Software by KIDASA Software, Inc. www.kidasa.com