Add a bitmap symbol to the toolbox

Change symbol color and shape when complete

I want to use a picture I have as a symbol on the schedule.  How do I go about doing this?

Add a missing Microsoft Project field to a schedule

I imported my Microsoft Project schedule but forgot one of the project fields.  Can I add it in?

Add text to a horizontal bar

I want to have text inside a horizontal bar on my schedule.  Is this possible?

Adjust the position of symbol within a task row to relieve crowding

Symbols on a task row are close together, if not on top of each other. How can I display them better?

Assign specific text to a toolbox symbol

Is there any way that I can assign each toolbox symbol to have a specific letter or string of text to it or to include the task name next to each symbol automatically so I don’t have to do it manually?

Add a percent complete symbol in a column

How do I add a percent complete symbol to a column?

Change the start and end dates for a schedule

Right now my schedule only shows 3 months.  I want it to include all the months in the current year.  How is this done?

Choose default symbols and bar to use for summary tasks

I want to change the symbols used for the summary bars.  How do I do this?

Need to do a detailed 1-wk schedule

I need to present a chart showing work performed on a project over the course of a week. I need to set up more than one entry per day per line.  I would like to be able to schedule work in 15 - 30 min increments. Is there any way to accomplish this with your software ?

Hide time in date columns

I only want to show the date in the Start and End date columns.  Right now, I see the date plus the time.  Is there a way to hide the time?

Hide calendar icons

All of my date columns display small calendar icons.  Is there a way to remove these?

Hide several task rows in a single operation

I know how to hide a single task.  Is there a way to hide several tasks in a single operation?

Change the shape of a symbol based on status

I would like a symbol to change both color and shape when it’s completed. Is this possible?

Bars not filling in

I imported my Microsoft Project schedule into Milestones Professional.  I want the bars to fill to the status date.  Most of them don't do this.  Why not?

Automation interface to Milestones

Is there a VBA or Visual Basic interface for Milestones?  I use VBA to perform automation from PowerPoint, Excel, Word and Project and it would be useful if I could access Milestones Professional similarly.

Change indicator symbols after importing from Project

My schedule was imported from Project using the Stoplight Indicators template.  I would like to change the colors of the indicators.  Is there a way to do this?

Can't see vertical links

I have a schedule with quite a few overlapping vertical links and it's very difficult to determine which symbols are connected.  Any suggestions?  Here's an example:

Autosave to protect files from crashes

If my computer crashes or reboots while I'm saving a Milestones schedule, how can I recover the file?  

Change font size for whole schedule

How can I change the font style and/or size of the entire schedule at once?  How can I set the font style and size for all symbol text on my schedule?  How can I change the font size for the column information for all tasks?

 

 

 

 

 

 

 

 

Applies to Milestones Professional:      2017        2019         2021         2023         2025

 

   

   

   

   

 

 

 

The fast easy way to schedule your projects:  Milestones Software by KIDASA Software, Inc. www.kidasa.com

Copyright © 2025 KIDASA Software, Inc. All rights reserved.