(Click the question title for the answer)
Help finding "invisible" symbols
I have deleted some symbols from a schedule , but there are several blank symbols scattered around and I’m having trouble finding them.
Vertical connectors in the legend
Can I show a vertical connector in the legend?

Want the line to appear on top of the bar when graphed
I would like to have the red line appear on top of the blue bars. How is this accomplished?

Hide indicator symbols on blank lines
I have indicator symbol values that are "0". How do I get Milestones Professional NOT to draw an indicator symbol on lines that are blank?
Add, Move, and Delete Freeform Text
Is there a way to add another header to the chart other than the title?
Copy the structure of a schedule only
Could you tell me if it is possible to copy the structure of a schedule without the data?.

I have the chart size set to 7.5" horizontal and 5.5." vertical. However, when I print the chart, it fills the entire page, rather than printing at the size I have specified. How can I get it to print using my specifications?
Standard curtains for all my projects
I would like the same curtains to appear on all of my schedules. How can I do this?
I would really like to show a symbol that looks like this one on my schedule. Is it possible?

Show percent symbol on a task row
I see that it is possible to add a pie symbol to a task row as a normal symbol. Can you tell me how to set this up?
Don't want short pages when using page breaks
Is there a way to use a page break which doesn't truncate the bottom of the chart? I want my pages to all be the same number of tasks per page.

What is a "Symbol Count" SmartColumn?

Any symbols I add show Month/Year instead of Month/day/year. (e.g. - 6/11 instead of 6/28 for a milestone of 6/28/2011). I would like the dates which appear above the symbols to show the month and the day. How do I change this?