Tips & Tricks for March 2024

(Click the question title for the answer)

Is there a way to have the date be part of the Note?

  

I added a symbol to my schedule and want to link it to Microsoft Project.  What's the easiest way?

Symbols on a task row are close together, if not on top of each other. How can I display them better?

How are Milestones' Comment symbols generally used in a schedule?

I have refreshed my Milestones Professional schedule with the latest dates from Microsoft Project.  Is there any way to see the deltas for tasks which have been changed?  Like this?

I can't figure out how to get rid of this extra thick line on my schedule.  It's apparently not a grid line and I can't pick it.

When I roll-up all lower-level task bars to the summary line, I would like to hide the symbol dates.  Is this possible?

I don't want to show a legend on the bottom of each page. Is there a way to make that space disappear so I can use that space for more task lines per page?

I have lost my schedule's vertical connections, globally (all of them!).  Any ideas how that happened?

Is there a faster way to move symbol notes?  I am using the toolbar directional arrows but find them sluggish

Whenever I use the Copy Schedule to Clipboard (OLE) function it only copies page 1, even if I move to pages 2 or 3.  Is this a defect?

I want to add a table to the bottom of my   schedule that show four types of funding broken out by fiscal years, and aligned with the calendar columns for the FYs. I have investigated valuesets, datasets and smartcolumn values, but I do not see the answer.  Suggestions?

I am using the import feature from Excel to MS Pro. Can I copy two lines from Excel into one line on MS Pro. I want to display current and baseline.